Winter’s Waste Water Treatment Facility – Winters, California

Winter's Waste Water TreatmentSystem Description:250kW single axis tracker PV system, with single SMA 250kW inverter.  System commissioned in May 2010.

Roles and Responsibilities: Coordinated with civil engineer on site requirements.  Responsible for the preparation of the complete set of electrical construction documents, which were then reviewed and stamped by CA licensed engineer.  Performed final system commissioning and performance validation.