Regional School District No.7 – Winsted, Connecticut

Regional School District 7System Description:450KW rooftop PV system located on multiple rooftops using a Sunlink ballasted PV racking systems.  System consisted of (1) 250kW and (1) 135kW Satcon inverters and new dedicated switchgear.  Existing switchgear needed to be upgraded to allow for the interconnection of the PV system.  System was commissioned in January 2010.

Roles and Responsibilities: Project Engineer responsible for array layout and preparation of the required construction documents.  Provided engineering oversight during construction and performed final system commissioning and performance validation.