Clean Harbors Development – Bridgeport, New Jersey

System Description:1.5 MW ground mounted system for a capped landfill.  System consisted of a ballasted racking system as the cap could not be penetrated.  System utilized (2) 500kW and (1) 250kW AEI bi-polar inverters.  System commissioned in April 2011.

Roles and Responsibilities: Provided conceptual level design and engineering oversight during development of the construction documents completed by a local engineering firm.